Project Details

Biomass Energy Production

Create a optimised pre-dispatched biomass into a consistent SYNGAS and low-emission electrical generation

One of the UK’s largest waste timber importers — operating a regional fulfilment hub, and vehicle maintenance facility — was spending over £1.5 million annually on gas and heating oil to heat its plant, with no coherent strategy to meet its board-level commitment to net zero by 2035.

The Challenge

High-efficiency treatment for complex and difficult waste streams.

The existing facilities presented a complex and varied challenge. The existing centre — ranging from 80,000 to 400,000 square feet — required continuous space heating throughout the year to maintain safe working temperatures for operational staff and to protect temperature-sensitive areas. Vehicle maintenance workshops operated around the clock, with high-bay heating demands that conventional heat pump technology could not efficiently serve.

The site is located in a industrial zone with no mains gas supply, relying entirely on delivered heating oil at volatile spot prices. Energy costs had increased by 62% over the preceding three years, and the existing infrastructure — much of it over twenty years old — was reaching the point of mandatory replacement. The board required a solution that could be designed and deployed in a new build facility, reduce energy expenditure materially, and provide independently verified carbon savings sufficient to underpin their published net zero commitments to investors and major retail clients.

Process overview & principal equipment setup

The Solution

We developed and delivered a rollout programme across the site in the first phase, with the remaining scheduled  phase for completion within a subsequent 18-month window. We installed automated wood chip biomass boiler systems sized to the specific heat demand profile of facility high-efficiency warm air heating systems replace legacy radiant tube and LTHW emitters within the warehousing and workshop areas, dramatically improving heat distribution in high-bay environments. A centralised energy management platform aggregates live performance data from all areas into a single dashboard, enabling the group’s facilities management team to monitor fuel consumption, heat output, and carbon displacement in real time.

Biomass feed stock is supplied under a ten-year managed contract with a consortium of certified UK forestry and sawmill operators, with fixed price escalators providing multi-year cost certainty. Surplus heat from the biomass plant is used to pre-condition incoming fleet vehicles overnight, reducing engine idle time and improving cold-start emissions performance across the HGV fleet.

£1.2M

Annual energy cost saving across the estate

79%

Reduction in Scope 1 emissions from heat

14,200 t

CO₂e displaced annually

Value Delivered

The programme has delivered the most significant single-operator biomass rollout in the UK logistics sector to date. Savings of £1.2 million annually against the prior energy baseline. The fixed-price feed stock supply contract provides cost certainty that gas and oil procurement could never offer, enabling more accurate long-term financial modelling across the group’s operational budget. Verified carbon reductions of 79% from heat generation have been formally recognised in the group’s annual sustainability disclosure, materially strengthening its ESG position with the major retailers and e-commerce operators that account for the majority of its contracted revenue. Two of those clients have since cited the biomass programme specifically as a factor in renewing long-term contracts, underscoring the direct commercial value of the group’s decarbonisation investment.

Get In Touch

Ready to transform your waste into a resource?

We’d love to hear from you — whether you’re interested in the project, partnership, or simply have a question. Speak to a biomass specialist today!

Operating a large or multi-site logistics estate? Our industrial energy team can design a biomass heating strategy scaled to your network, with phased delivery to minimise operational disruption.